Protección contra flujos de detritos y deslizamientos superficiales - Shis - Khor Fakkan road 2019

Most demanding system test: A few weeks after installation, a debris flow hit the barrier. A sound design, combined with excellent installation works, stopped the debris and prevented the damage.

Protección contra flujos de detritos y deslizamientos superficiales - Shis - Khor Fakkan road 2019

Stakeout of the ring net barrier layout: Critical step prior to drilling works to ensure the best performance of the system

Protección contra flujos de detritos y deslizamientos superficiales - Shis - Khor Fakkan road 2019

Drilling of the lateral spiral wire rope anchors: Different drilling rigs can be used, depending on the prevailing geology, location, and available machines

Protección contra flujos de detritos y deslizamientos superficiales - Shis - Khor Fakkan road 2019

Depending on the length of the lateral spiral wire rope anchors, different tools are used

Protección contra flujos de detritos y deslizamientos superficiales - Shis - Khor Fakkan road 2019

As an alternative to stabilizing mesh, a lateral shotcrete layer prevents erosion. The flexible riverbed (V)X barrier was installed within only a couple of days. Great work by Gulf Rock Engineering!

Protección contra flujos de detritos y deslizamientos superficiales - Shis - Khor Fakkan road 2019

Rockfall barrier GBE-1000A protecting a tunnel portal at Shis - Khor Fakkan road

 
 

Longitud del sistema

6 m - 15 m

 

Año de instalación

2019

Situación inicial

The scenic new mountain highway westwards from Khor Fakkan is crossing several Wadis (valleys). Despite the rather arid climate, heavy annual rainfalls are likely to cause debris flows and land- or mudslides along the Wadis.

A solution was necessary to prevent debris flows from blocking the drainage culverts and, even worse, overflow the newly constructed highway.

 

Descripción

Two 6 meters high VX flexible debris flow barriers

The debris flow barriers were designed using the DEBFLOW online tool in close collaboration with the clients engineering team. The expected impact loads (kN/m²) were calculated based on geology, topography, and other decisive boundary conditions.

In Mai 2019, one of the flexible debris flow barriers underwent the most severe proof: Heavy rainfall triggered several debris flows along the various Wadi's. One of them hit the recently completed barrier which remained undamaged. After an excavator had removed the debris material, the barrier was ready again for the next thunderstorms.

Cliente

Gulf Rock Engineering

Objeto protegido

Carretera

Protección contra la corrosión

GEOBRUGG SUPERCOATING

Otras aplicaciones instaladas

Protección contra caídas de rocas

Su contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Country Manager Ost- und Zentralschweiz, Liechtenstein

Correo electrónico

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Correo electrónico

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Protección contra riesgos naturales
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Project Manager Inspection Services

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suiza Ticino Country Manager

Correo electrónico