Estabilización de taludes - Schwäbisch Gmünd 2015

Overview of the stabilized slope with area for future building foundation in the back

Estabilización de taludes - Schwäbisch Gmünd 2015

Fresh cut after nailing - visible erosion prone ground conditions

Estabilización de taludes - Schwäbisch Gmünd 2015

Hydraulic piling machine used on the project

Estabilización de taludes - Schwäbisch Gmünd 2015

Installation of the TECCO® SYSTEM3 and anti-erosion mat. Visible piling activity in the background

Estabilización de taludes - Schwäbisch Gmünd 2015

.

Estabilización de taludes - Schwäbisch Gmünd 2015

Tallest slope area after hydroseeding

Estabilización de taludes - Schwäbisch Gmünd 2015

Fully protected slope after hydroseeding. Pile wall visible at the base of the slope.

Estabilización de taludes - Schwäbisch Gmünd 2015

Revegetation on the fully protected slope during building construction

 
 

Año de instalación

2015

Situación inicial

The developer was planning several residential buildings on the hillside north of the river Rems in Schwabisch Gmund (near Stuttgart). The pit was created with a pile wall for excavation support. This area was backfilled after the buildings were completed. In the upper slope area, which remains visible; however, the developer chose to implement a solution that allows revegation.

Geología

The slope incision is located in the Stubensandstein layer, and is therefore partly based on stiff loams.

Descripción

For dimensioning the nail grid pattern global stability was observed and recorded first. In a second step the near-surface instabilities were dimensioned. As is typical for most excavation activity, this slope was excavated from the top down in 1.5 m increments. Immediately following excavation the erosion control mat and TECCO® System were anchored in place with soil nails.

The solution was chosen because:

- Cohesive soils / grounds with an appropriate supply of nutrients for successful revetation,

- Active and immediate greening of the embankment by hydroseeding,

- Through future building the slope will be shaded,

- Four years ago, a similar project using TECCO® System was completed nearby and has shown successful revegetation.

Cliente

((... wil be completed by STS/GRE))

Objeto protegido

Edificio

Protección contra la corrosión

GEOBRUGG SUPERCOATING

Otras empresas participantes

Sidla & Schönberger Spezialtiefbau GmbH

Su contacto local

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / EE. UU. Regional Manager Northeast

Correo electrónico

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / EE. UU. Regional Manager California

Correo electrónico

John Kalejta
 

John Kalejta

Regional Manager Central US

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / EE. UU. Regional Manager Central US

Correo electrónico

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / EE. UU. Regional Manager Southeast

Correo electrónico

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Protección contra riesgos naturales
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Correo electrónico

Tim Shevlin
 

Tim Shevlin

Sales Director

Protección contra riesgos naturales
Geobrugg North America, LLC,Salem OR 97302 / EE. UU. Sales Director

Correo electrónico