Suiza
Suiza

myGeobrugg

Estabilización de taludes - Ringelaier Leite St 2127 2015

Single rock stabilization with SPIDER®-System.

Estabilización de taludes - Ringelaier Leite St 2127 2015

Rockfall triggered by rock scaling.

Estabilización de taludes - Ringelaier Leite St 2127 2015

Closeup view of the very impressive rock that fell due to rock scaling. Workers were able to successfully remove the rock from the roadway.

Estabilización de taludes - Ringelaier Leite St 2127 2015

Partial protection with SPIDER®-System.

Estabilización de taludes - Ringelaier Leite St 2127 2015

Partial protection with TECCO® SYSTEM³.

Estabilización de taludes - Ringelaier Leite St 2127 2015

Partial protection with SPIDER®-System.

Estabilización de taludes - Ringelaier Leite St 2127 2015

Detailed view of SPIDER®-System.

Estabilización de taludes - Ringelaier Leite St 2127 2015

Excess vegetation must be routinely removed so roots cannot cause increasing amount of pressure and trigger instability in the slope.

 
 

Año de instalación

2015

Situación inicial

Some 50 years ago State Road 2127 was widened to accommodate increased traffic volume. Sections of rock face adjacent to the roadway required scaling. The material that was removed was reused as part of the pavement. Because of the stability of the local rock, no protection measures were required.

As a consequence of being moderately to heavily saturated over the past 20 years, crevices in the rock fragments have expanded, in most parts by over one meter. The crevices bisect the steep rock face nearly vertically and caused several rockfall incidents in 2014.

The Bavarian Agency for Environment decided to install several single-block stabilization systems. Further actions have not been planned due to costs and environmental protection.

Geología

Quartz / Slate

Descripción

During rock scaling, those rocks with a volume of up to 6 m³ were removed. Critical sections with reduced stability are now being stabilized with the SPIDER® and TECCO® protection systems.

Cliente

State Administration Passau

Subcontratista

HTB Kufstein

Objeto protegido

Carretera

Protección contra la corrosión

GEOBRUGG SUPERCOATING

Ingeniería

IFB Eigenschenk

Su contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Country Manager Ost- und Zentralschweiz, Liechtenstein

Correo electrónico

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Correo electrónico

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Protección contra riesgos naturales
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Project Manager Inspection Services

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suiza Ticino Country Manager

Correo electrónico