EE. UU.
EE. UU.

myGeobrugg

Estabilización de taludes - Greenhithe 2022

View eastwards of slope stabilisation

Estabilización de taludes - Greenhithe 2022

View southwards from crest of slope

 

Año de instalación

2022

Situación inicial

A sudden landslip in November 2021 was the first indication of underlying instability of the existing chalk cutting on the northern side. Immediate reactive works were needed to clear vegetation and underlying chalk material from the cess and track.

Tony Gee was engaged as the designer to engineer a permanent solution to ensure the stability of the cutting going forward. BAM Ritchies were chosen as the specialist geotechnical contractor to install the solution.

Geología

Lewes Nodular Chalk Formation, Seaford Chalk Formation And Newhaven Chalk Formation (undifferentiated) - Chalk. Sedimentary Bedrock formed approximately 72 to 94 million years ago in the Cretaceous Period. Local environment previously dominated by warm chalk seas.

Descripción

A solution of TECCO G45/2 mesh was chosen along with TECMAT within the upper half of the slope to provide slope stability and erosion protection. The final solution included 340 rock bolts, the lower half of which were installed from track level during a possession with the help of Pro Rail Services long-reach RRV’s.

Cliente

Ingeniería

Subcontratista

Objeto protegido

Ferrocarril

Protección contra la corrosión

GEOBRUGG SUPERCOATING

Su contacto local

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / EE. UU. Regional Manager Northeast

Correo electrónico

Saleh Feidi
 

Saleh Feidi

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / EE. UU.

Correo electrónico

John Kalejta
 

John Kalejta

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,KS 67226 Wichita / EE. UU.

Correo electrónico

Bob Lyne
 

Bob Lyne

Protección contra riesgos naturales
Ingeniería hidráulica
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / EE. UU.

Correo electrónico

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Protección contra riesgos naturales
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Correo electrónico

Tim Shevlin
 

Tim Shevlin

Protección contra riesgos naturales
Geobrugg North America, LLC,OR 97302 Salem / EE. UU.

Correo electrónico