스위스
스위스

myGeobrugg

Fierza Hydroelectric Power Station #3

비탈면 보강 시스템 - Fierza Hydroelectric Power Station #3 2014

Slope protected with TECCO® G65/3 mesh and TECMAT®.

비탈면 보강 시스템 - Fierza Hydroelectric Power Station #3 2014

Drilling work and nail installation.

비탈면 보강 시스템 - Fierza Hydroelectric Power Station #3 2014

Drilling work and nails installation completed with a "Spider" machine.

비탈면 보강 시스템 - Fierza Hydroelectric Power Station #3 2014

Installation using a drilling machine always requires a two-man crew.

비탈면 보강 시스템 - Fierza Hydroelectric Power Station #3 2014

Slope protected with TECCO® G65/3 mesh and TECMAT®.

비탈면 보강 시스템 - Fierza Hydroelectric Power Station #3 2014

TECCO® G65/3 high-tensile steel mesh is very light weight, allowing helicopter installation.

 

Year of installation

2014

Situation

Slope instability on the lake sides had to be stabilized.

Description

Slope stabilization with TECCO® System with TECCO® G65/3 mesh with TECMAT® for erosion control.

Stabilization of single boulder with SPIDER® S4-230 net.

Customer

KESH Albania

Contractor

Cresta Geo Switzerland

Protected object

Road, Building

Corrosion protection

GEOBRUGG SUPERCOATING

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail