Camarillo Springs Emergency

토석류 및 산사태 방호 시스템 - Camarillo Springs Emergency 2015

One of five UX type debris flow barriers already installed - view from the valley side - type UX180-H6

토석류 및 산사태 방호 시스템 - Camarillo Springs Emergency 2015

Previous debris flow caused damage to two residences

토석류 및 산사태 방호 시스템 - Camarillo Springs Emergency 2015

Previous debris flowed up to the roof line.

토석류 및 산사태 방호 시스템 - Camarillo Springs Emergency 2015

Another view of the damages caused by the debris flow.

토석류 및 산사태 방호 시스템 - Camarillo Springs Emergency 2015

Installation of posts for the UX-180-H6 barrier - for Geobrugg's debris flow barriers only lightweight equipment is necessary

토석류 및 산사태 방호 시스템 - Camarillo Springs Emergency 2015

Installation of the top support rope for the UX-180-H6 type debris flow barrier

토석류 및 산사태 방호 시스템 - Camarillo Springs Emergency 2015

More detailed view of fully installed debris flow barrier type VX140-H4

토석류 및 산사태 방호 시스템 - Camarillo Springs Emergency 2015

Debris flow barrier type VX140-H4 after the first event - visible perfect state of the already loaded protection

 

System length

6 m - 25 m

 

Year of installation

2015

Situation

After wildfires stripped the hills bare of vegetation, torrential rains during the monsoon season of 2014 created significant debris flow events impacting and devastating homes. With the 2015 El Niño approaching, preventive measures were quickly installed in the hillsides above Camarillo Springs as the primary mitigation measure against future debris flows.

Description

The City of Camarillo hired the engineering company Kane Geotech, Inc. (Kane Geotech) to design debris flow mitigation measures. Dr. William Kane designed a plan and specified use of Geobrugg’s debris flow and shallow landslide barriers placed strategically within high risk gullies (barrancas).

At the end of 2015 the City of Camarillo hired Access Limited Construction Co., Inc. (Access Limited) to install the Geobrugg systems. Access Limited worked with Kane Geotech and Geobrugg to have the barriers installed before the rains hit. Geobrugg delivered material and Access Limited completed installation well ahead of the January 31st deadline. El Niño reached California the very next week and the Geobrugg Debris Flow barriers performed as designed.

Retention capacity:

Barranca 1 = 2,000 CY / 1,530 m³
Barranca 2 = 10,000 CY / 7,645  m³
Barranca 3 =12,000 CY / 9,175 m³
Total of 24,000 CY / 18,350 m³

Watch the clip on keyt-tv, Santa Barbara

Customer

City of Camarillo

Contractor

Access Limited Construction Co., Inc.

Protected object

Building

Corrosion protection

Galvanized, GEOBRUGG SUPERCOATING

Engineering

Kane Geotech, Inc.

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail