토석류 및 산사태 방호 시스템 - Königstein, Saxony 2012

The installed UX060L-H4 barrier from the top - below the protected railway and the road

토석류 및 산사태 방호 시스템 - Königstein, Saxony 2012

Geology of the construction site - visible material which could be potentially triggered and form a debris flow

토석류 및 산사태 방호 시스템 - Königstein, Saxony 2012

Overview of the torrents endangering the infrastructure below

토석류 및 산사태 방호 시스템 - Königstein, Saxony 2012

For the transport of construction material a temporary, inclined elevator platform was installed

토석류 및 산사태 방호 시스템 - Königstein, Saxony 2012

Anchor drilling was executed from the temporary platform

토석류 및 산사태 방호 시스템 - Königstein, Saxony 2012

UX060L-H4 debris flow barrier's post already connected with the ground plate - with a very elegant fundament

토석류 및 산사태 방호 시스템 - Königstein, Saxony 2012

Barrier anchor drilling was executed using mobile drilling devices

토석류 및 산사태 방호 시스템 - Königstein, Saxony 2012

Detailed view of Geobrugg's wire rope anchors: anchor head with double corrosion protection, ensuring long lasting and maintenance free usage

토석류 및 산사태 방호 시스템 - Königstein, Saxony 2012

Closer look on the UX060L-H4 debris flow barrier after installation was finished in May, 2012

토석류 및 산사태 방호 시스템 - Königstein, Saxony 2012

The UX060L-H4 debris flow barrier from below - thanks to its lightweight structure, all installation works could be executed by hand

 

Systems

 

System length

7 m - 25 m

 

Year of installation

2012

Situation

The railway track from Dresden to Děčin (Czech Republic) experienced heavy rain that triggered several mudslides in August 2010.  They blocked the railway line and the parallel road next to the city of Königstein.

This area shows signs of weathering and slope erosion. Blocks with an edge length up to two meters are embedded and shows first signs of instabilities.

The slope has an average inclination of 30 to 35 degrees and thanks to two torrents creating Y shape can mobilize up to 100 m³ of debris flow material.

Description

Based on data collected in September 2010, the debris flow barrier was dimensioned using our DEBFLOW software. The optimum location for the barrier was a terrain transition in a flume area with undisturbed edge structure. The embankments on both sides offered fully extensive anchoring options.

Customer

City of Königstein

Contractor

Bergsicherung Freital GmbH

Protected object

Road, Railway

Corrosion protection

Galvanized, GEOBRUGG SUPERCOATING

Engineering

Geobrugg AG

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail