Tunsbergdalsdammen Access Control

Avalanche Prevention - Tunsbergdalsdammen Access Control 2017

The new access control fence

Avalanche Prevention - Tunsbergdalsdammen Access Control 2017

The old access control fence with an insufficient height of about 1 meter

Avalanche Prevention - Tunsbergdalsdammen Access Control 2017

The old fence clearly was not high enough

Avalanche Prevention - Tunsbergdalsdammen Access Control 2017

Overview on the water outlet channel with the slope above - a very popular spot for cross country skiing

Avalanche Prevention - Tunsbergdalsdammen Access Control 2017

The access control fence after installation

Avalanche Prevention - Tunsbergdalsdammen Access Control 2017

The new fence is a barrier for people; it also withstands heavy snow loads ...

Avalanche Prevention - Tunsbergdalsdammen Access Control 2017

... ideal for Geobrugg's multi hazard barrier

 

Systems

Special Solutions

 

System length

112 m

 

Year of installation

2017

Initial situation

Statkraft Energi AS skal erstatte sikkerhetsgjerde rundt samlekanal sør for Tunsbergdalsdammen i Luster.

During wintertime, the slopes around Tunsbergdalsdammen Water Power Plant are very popular for cross-country skiing. To avoid injuries the Statkraft Energi AS had installed a simple fence around the water outlet channel. With a height of about a meter, the protection was not sufficient.

South of the Tunsbergdalsdammen in Luster the Statkraft Energi AS replaced the security fence around the joint channel. The new fence was designed to prevent people and skiers from falling into the water.

Description

For the fence, it was required not only to prevent people from falling into the channel but also to withstand snow loads of 2 meters.

Customer

Statkraft Energi AS

Contractor

Fjerby AS

Protected object

Touristic infrastructure, Infrastructure, Other

Corrosion protection

Galvanized, GEOBRUGG SUPERCOATING

Engineering

NGI

Other installed applications

Avalanche Prevention

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail