Switzerland
Switzerland

myGeobrugg

Slope Stability - Tunel Kloštar 2015

Tunnel Klostar portal and slopes around in the final state after stabilization.

Slope Stability - Tunel Kloštar 2015

Drilling works on the slope directly next to the tunnel portal.

Slope Stability - Tunel Kloštar 2015

Drilling works and installation of nails on the tunnel portal.

Slope Stability - Tunel Kloštar 2015

Tunnel portal protected with TECCO® SYSTEM3.

Slope Stability - Tunel Kloštar 2015

TECCO® SYSTEM3 on the slope.

Slope Stability - Tunel Kloštar 2015

.

Slope Stability - Tunel Kloštar 2015

.

Slope Stability - Tunel Kloštar 2015

.

Slope Stability - Tunel Kloštar 2015

.

Slope Stability - Tunel Kloštar 2015

Tunnel portal after completion of all installation works.

 

Year of installation

2015

Initial situation

Rockfalls on a speed up railway line near tunnel Kloštar.

Geology

Limestone.

Description

Active slope protection and tunnel portal with nailed DELTAX® mesh and TECCO® System

Customer

Hrvatske željeznice

Contractor

Octopus Rijeka

Protected object

Railway

Corrosion protection

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

Engineering

Geotehnički studio Zagreb

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail