United States
United States

myGeobrugg

Rockfall Protection - T35 Project 2013

.

Rockfall Protection - T35 Project 2013

.

Rockfall Protection - T35 Project 2013

.

Rockfall Protection - T35 Project 2013

.

 

Systems

T35

 

System length

- 800 m

 

Year of installation

2013

Initial situation

-

Description

Roadtek approached Geobrugg to supply a low energy rockfall fence, to reduce the risk at 4 different sites in the Gold Coast hinterland. Initially 600m of a 1.8m high, T35 (35 kJ) was supplied, with an additional 200m ordered and supplied in under two weeks.

Customer

Roadtek

Contractor

The Rix Group

Protected object

Road

Engineering

Geobrugg

Your local contact

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / United States Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / United States Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / United States Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / United States Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Natural Hazards
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Natural Hazards
Geobrugg North America, LLC,Salem OR 97302 / United States Sales Director

E-Mail