Symmons Plains 2016 - Geobrugg Symmons Plains 2016 - Geobrugg
Symmons Plains 2016 - Geobrugg Symmons Plains 2016 - Geobrugg
Symmons Plains 2016 - Geobrugg Symmons Plains 2016 - Geobrugg
Symmons Plains 2016 - Geobrugg Symmons Plains 2016 - Geobrugg

Symmons Plains

view address in Google Maps  Share
Street
1487 Midland Hwy
ZIP code
7300
Place
Perth TAS
Country/Region
Australia
Year of installation
2016
Customer
Symmons Plains
Engineering
Geobrugg AG
Systems
FIA debris fence
System height
2.5 m
Other installed applications
Race Tracks
Situation

Symmons Plains has been largely a construction zone since late last year thanks to a $ 2 million state government grant to lift safety and presentation standards at the circuit.

Safety work has included the refurbishment of all of the 2.41 km layout’s gravel traps, with 5,000 tonnes of new gravel to arrest out of control cars and bikes.

A kilometer of earth-filled tyre walls around the inside of the circuit has also been replaced by concrete, running from partway down the back straight all the way around to Turn 2.

The exit of Turn 2 meanwhile sees a new debris fence installed to protect spectators.

Description

Geobrugg AG was involved in the layout design, manufacturing and delivery of the Geobrugg Debris Fence for turn 2.

Your local contact

Jochen Braunwarth
Jochen Braunwarth
Director Motorsport Solutions
Motorsport
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Switzerland
Phone +41 71 466 84 24
Mobile +41 78 737 95 64

Contact form