Stromeferry Railway Station

Slope Stability - Stromeferry Railway Station 2021

Railway protection with TECCO mesh

Slope Stability - Stromeferry Railway Station 2021

TECCO on rock slope

 
 

Year of installation

2021

Initial situation

Several rock blocks had fallen into the cess, the largest of which was 1.8 x 1.0 x 0.7 cubic meters. After inspection, a length of 80 meters was found to have the potential for failure.
The designer needed a strong solution, which was quick to design and rapidly available for emergency repairs.

Geology

Lewisian Gneiss

Description

We supplied TECCO G65/3 on short notice to a remote site in the Highlands. While working with the designer in the background, we ensured they had all the necessary technical data for their design.

Customer

Network Rail

Contractor

Scots Rope Access

Protected object

Railway

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail