United States
United States

myGeobrugg

Stelzentunnel Tunnel Maintenance

Road fencing - Stelzentunnel Tunnel Maintenance 2017

Stelzentunnel: driving lanes and the construction site area are separated from each other and ensure safety on both sides. In the picture: before extending the panels to the required height

Road fencing - Stelzentunnel Tunnel Maintenance 2017

Bottom: standard «step» concrete element; top: braced against the ceiling

Road fencing - Stelzentunnel Tunnel Maintenance 2017

The rapid construction and mobility of the system require only short road closures in the tunnel

Road fencing - Stelzentunnel Tunnel Maintenance 2017

Fence panels with wooden boards - they protect the traffic from dust and water of the construction works and withstand the airflow of the trucks.

Road fencing - Stelzentunnel Tunnel Maintenance 2017

Close-up panel with formwork panels

 

Systems

Special Solutions Mobile Road Fencing

 

System length

400 m

 

Year of installation

2017

Initial situation

One of Switzerland's central motorways runs through the Stelzentunnel near Zurich. Since 2017, the Stelzentunnel (1.6 km long) has been renovated in stages.

A mobile protective fence separates the trafficable lanes from the construction site. One of the requirements of this protective fence was that it could be erected quickly so that the motorway only needs to be closed for a few hours.

Description

Geobrugg optimized the design of the mobile debris fence used at motorsport venues to comply with the requirements for road works in a tunnel. The NORDBETON motorsport concrete barriers have been changed to standard NORDBETON public roadwork concrete barriers. Additionally, the debris fence panels have been extended to the on-site tunnel height and stabilized accordingly. They are telescopic and can be braced in the tunnel ceiling. Das System ist in der Höhe zwischen zwei und vier Metern anpassbar.

Customer

Arge Nordring Los 4

Engineering

Geobrugg AG

Contractor

Geobrugg AG

Other participating companies

NORDBETON GmbH

Your local contact

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / United States Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / United States

E-Mail

John Kalejta
 

John Kalejta

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,KS 67226 Wichita / United States

E-Mail

Bob Lyne
 

Bob Lyne

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / United States

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Natural Hazards
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Natural Hazards
Geobrugg North America, LLC,OR 97302 Salem / United States

E-Mail