Switzerland
Switzerland

myGeobrugg

Rockfall Protection - Seehorn Davos 2022

The Flüela pass road: again protected from rockfall and avalanches

Rockfall Protection - Seehorn Davos 2022

Delivery of the supports and nets by helicopter

Rockfall Protection - Seehorn Davos 2022

The pre-installed ringnet can be drawn like a curtain

Rockfall Protection - Seehorn Davos 2022

Completely installed rockfall and avalanche protection barrier

 

Systems

Special Solutions

 

System length

44 m

 

Year of installation

2022

Initial situation

A 30-year-old barrier was severely damaged by rockfall. It had to be replaced as quickly as possible to protect the traveled road below from rockfalls and avalanches.

Description

Eberle Landschaftsbau und Geotechnik AG installed the four-meter high and 44-meter long Geobrugg special solution.

Customer

Protected object

Road

Corrosion protection

Galvanized

Other installed applications

Avalanche Prevention

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail