United States
United States

myGeobrugg

Rockfall Protection - Samphire Hoe in Dover 2015

Train passing under one of the GBE-1000A (for 1000 kJ) rockfall barriers while under going its final inspection.

Rockfall Protection - Samphire Hoe in Dover 2015

Evidence of rock fall below the cliffs before any remedial measures were taken. Visible is a normal chain link fence, which has previously been breached leading to track closures.

Rockfall Protection - Samphire Hoe in Dover 2015

Cliffs during TECCO® SYSTEM³ stabilization works.

Rockfall Protection - Samphire Hoe in Dover 2015

Rope access techniques in use for drilling and installation of the TECCO® SYSTEM³ stabilization.

Rockfall Protection - Samphire Hoe in Dover 2015

Cliff area stabilized with the TECCO® SYSTEM³. Rockfalls triggered here could over top the rockfall barriers below.

Rockfall Protection - Samphire Hoe in Dover 2015

GBE-500A (for 500 kJ) rockfall barrier below the cliffs. Note the evidence of small rockfalls already stopped by the barrier.

Rockfall Protection - Samphire Hoe in Dover 2015

GBE-1000A (for 1000 kJ) rockfall barriers during installation. Here you can see the final adjustments to the vertical ropes.

Rockfall Protection - Samphire Hoe in Dover 2015

Final checks on GBE-1000A rockfall barrier line. Cliff below stabilized with TECCO® SYSTEM³.

Rockfall Protection - Samphire Hoe in Dover 2015

Final adjustments on the GBE-1000A rockfall barrier. This barrier offers unbeatable installation simplicity.

Rockfall Protection - Samphire Hoe in Dover 2015

Another line of GBE-1000A rockfall barriers during final inspection.

Rockfall Protection - Samphire Hoe in Dover 2015

Another view of GBE-1000A rockfall barriers during final inspection.

 

System length

446 m - 785 m

 

Year of installation

2015

Initial situation

The chalk cliffs at Dover form a vital element of the Kent Downs Area of outstanding natural beauty, a nationally important and protected landscape. Samphire Hoe is a new piece of land created by Eurotunnel during the construction of the Channel Tunnel.


Samphire Hoe cutting has a history of rockfall, with previous failures landing on the track.
The design remit was to extend the life of the earthwork such that there is a reduced likelihood of speed restrictions or line closure due to rockfall.


Tactile inspection by Fairhurst revealed the main mechanisms of slope instability to comprise ravelling across the slope face, caused by surface weathering and preferential erosion of weaker chalk horizons, together with more localised toppling, wedge sliding and planar sliding failures of individual blocks.

Description

Working alongside Fairhurst - Consulting Structural and Civil Engineers of Glasgow CAN Geotechnical Ltd. undertook the installation of 13 individual Geobrugg rockfall barriers. The GBE range of barriers were chosen for their ease of installation. Their low anchor forces meant shorter anchors with the resultant decrease in drilling time, allowing for a far shorter program.  The strict vertical drop testing and certifications that come with these fences meant that the only choice of supplier was the world leading technology innovator Geobrugg.


Rockfall analysis was undertaken by Fairhurst and the system energy and height were specified from this point forward. In total 785 metres of GBE-500A and 446 metres of GBE-1000A have been installed between Abbotscliffe and Shakespeare Tunnels. The barriers were used in combination with localised areas of Geobrugg high tensile TECCO® SYSTEM³ flexible facing in total 3150 square metres of TECCO® G65/3 and 350 pieces of P33 system spike plates were installed.

Customer

Network Rail Ltd.

Contractor

CAN Geotechnical Ltd.

Protected object

Railway

Corrosion protection

Galvanized, GEOBRUGG SUPERCOATING

Engineering

Fairhurst - Consulting Structural and Civil Engineers

Other installed applications

Slope Stability

Your local contact

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / United States Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / United States Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / United States Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / United States Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Natural Hazards
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Natural Hazards
Geobrugg North America, LLC,Salem OR 97302 / United States Sales Director

E-Mail