Switzerland
Switzerland

myGeobrugg

Rockfall Protection - Røldal 2017

RXE-5000 rockfall protection system completely installed and «waiting» for rocks.

Rockfall Protection - Røldal 2017

Support ropes and transmission ropes installed with ROCCO® ring net ready for installation at the posts.

Rockfall Protection - Røldal 2017

Installation of 8 meter high posts

Rockfall Protection - Røldal 2017

Support ropes and transmission ropes installed; ROCCO® ring net ready for installation at the posts.

 

Systems

 

System length

50 m - 50 m

 

Year of installation

2017

Initial situation

A transformator station (Transformatorstasjon) had to be protected from rockfall.

Description

A 8 meters high RXE-5000 barrier was installed.

Customer

Norsk Bergsikring AS

Contractor

Norsk Bergsikring AS

Protected object

Road, Building, Infrastructure

Corrosion protection

Galvanized, GEOBRUGG SUPERCOATING

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail