Avalanche Prevention - Raumabanen - Verma 2026

A picture of the final inspection of the debris flow barrier at -20°C in February 2026

Avalanche Prevention - Raumabanen - Verma 2026

Project site Raumabanen - Verma after the event and before the measures

 
 

System length

51 m

 

Year of installation

2026

Initial situation

Following a landslide at Verma station on 19 July 2025, the Rauma railway line (Raumabanen) between Dombås and Åndalsnes was destroyed. The landslide struck the tracks at two locations, suspending train services between Dombås and Åndalsnes. 

The landslide was triggered by torrential rain above the tree line beneath Mount Bjørnhammeren. The landslide debris struck both the upper and lower sections of the railway line at Verma station, as well as the E136. The Romsdal Railway runs through challenging terrain in the Romsdalen valley. At Verma station, a spiral-shaped tunnel is used to negotiate the difference in altitude. This means that the train passes through the same area twice – once on its way into the tunnel and once on its way out. As a result, the line was affected by the same landslide in two places. Securing and reconstructing the area is a highly complex project involving disciplines such as geology, geotechnical engineering, hydrology and railway infrastructure.

Description

To protect the two railway lines and the road beneath them, the first step was to install a reinforced rockfall barrier (Geobrugg RXE-5000) directly above the railway lines. The second step was to install a UX180-H6 barrier above this, adapted to the on-site conditions. The repair works were taking place in a very challenging, steep area prone to landslides. 

The customized barrier is designed to withstand multiple natural hazards. Following the natural hazard assessment, it was determined that rockfalls, debris flows and slush flows were to be expected at the site. The barrier was designed to withstand all these impacts. To prevent debris and slush from flowing around the barrier, it was constructed with several changes in direction towards the mountain. The aim was to keep the top edge of the barrier at a consistent height, to create a basin, and, in the event of overflow, to channel it towards the center

Country/Region

Norway

Customer

Engineering

Protected object

Railway, Touristic infrastructure, Infrastructure

Corrosion protection

GEOBRUGG SUPERCOATING

Your local contact

Saleh Feidi
 

Saleh Feidi

Regional Sales Manager California and Nevada

Natural Hazards
Impact Protection
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / United States Regional Sales Manager California and Nevada

E-Mail

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

Natural Hazards
Impact Protection
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / United States Regional Sales Manager Northeast

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Natural Hazards
Impact Protection
Geobrugg North America, LLC,KS 67226 Wichita / United States Regional Manager Rocky Mountains / Central USA

E-Mail

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Natural Hazards
Impact Protection
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / United States Regional Sales Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Natural Hazards
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Natural Hazards
Impact Protection
Geobrugg North America, LLC,2050 Timber St S,OR 97302 Salem / United States Regional Sales Manager Pacific Northwest and Hawaii

E-Mail