Switzerland
Switzerland

myGeobrugg

Slope Stability - Purple Rock East 2015

View of stabilized slope from the top

Slope Stability - Purple Rock East 2015

.

Slope Stability - Purple Rock East 2015

Drilling works on the top slope

Slope Stability - Purple Rock East 2015

Installation of TECCO SYSTEM with telescopic crane

 
 

Year of installation

2015

Initial situation

Rock slope with risk of rockfall due to fractured and weathered rock mass.

Description

Slope stabilization with TECCO System (G65-3)and anchors of D32 mm every 2 meters.

Customer

Autoridad del Canal de Panamá - ACP

Contractor

Alvarado & Düring International

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

Autoridad del Canal de Panamá - ACP

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail