Switzerland
Switzerland

myGeobrugg

Slope Stability - Lyme Regis 2014

View from West looking East two months after slope works completed

Slope Stability - Lyme Regis 2014

Early stage of the works. Prior to mesh installation

Slope Stability - Lyme Regis 2014

Torque applied to spike plate and soil nail

Slope Stability - Lyme Regis 2014

Abseiling whilst unrolling TECCO® G65/3 mesh

Slope Stability - Lyme Regis 2014

View down slope showing irregular slope angles and topography

Slope Stability - Lyme Regis 2014

View to West extent of work site.

Slope Stability - Lyme Regis 2014

Vertical seams being joined with TECCO® T3 connection clips

Slope Stability - Lyme Regis 2014

View looking East across the full slope works

 
 

Year of installation

2014

Initial situation

An area of Special Scientific Interest and part of the World Heritage Jurrasic coast was under threat from movement along a historic landslide. This put 240 houses under threat and over 900 metres of main road network.

Geology

Blue Lias overlayed with Shales With Beef ('beef' is the local name given to jagged layers of limestone that occur between the shales); Black ven marls 

Description

Soil Nail design was completed by AECOM as part of this process a flexible facing was required. Through close communication with the design team and contractor CAN we were able to specify the use of TECCO® mesh G65/3. After careful consideration of the local environment, it was decided to use the improved galvanizing of ULTRACOATING to increase the lifespan of the TECCO® mesh on site.

A vertical nail spacing of 1 metre and horizontal of 2 metres was required for control of the global stability. Using various drill rigs, soil nails have been drilled to depths of 18 metres at an angle of 25 degrees below horizontal. At each soil nail head, the ground has been recessed slightly to allow for the large plate to be installed. This also allows for good tensioning of the TECCO® mesh.

Customer

West Dorset District Council

Contractor

CAN Geotechnical

Protected object

Road, Building, Touristic infrastructure, Residential area, Other

Corrosion protection

GEOBRUGG ULTRACOATING

Engineering

AECOM

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail