Switzerland
Switzerland

myGeobrugg

Avalanche Prevention - Los Bronces (2) 2014

.

Avalanche Prevention - Los Bronces (2) 2014

.

Avalanche Prevention - Los Bronces (2) 2014

.

Avalanche Prevention - Los Bronces (2) 2014

.

Avalanche Prevention - Los Bronces (2) 2014

.

 

System length

300 m - 300 m

 

Year of installation

2014

Initial situation

A new installation was built near a slope with a high avalanche potential. Protective measures were therefore necessary.

Description

The installed avalanche fences prevent the formation of avalanches.

Customer

Anglo American, Los Bronces

Contractor

Geobrugg Andina

Engineering

Anglo American, Los Bronces

Other participating companies

Geobrugg Iberica

Other installed applications

Underground & Open Pit Mining

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail