United States
United States

myGeobrugg

Slope Stability - Lago Emperador 2018

View of wall with steel support structure

Slope Stability - Lago Emperador 2018

Wall with supportive mesh structure

Slope Stability - Lago Emperador 2018

Outside view of the protected wall

 
 

Year of installation

2018

Initial situation

The wall above the concrete mixer showed signs of deterioration.

Description

After a structural analysis: Steel cables and DELTAX® 80/2 mesh support the wall and transfer the forces to the ground through spiral rope anchors placed on the slopes lateral to the wall.

Country/Region

Panama

Customer

Concretos Emperador S.A.

Engineering

IDM Ingeniería y Construcción S.A.

Contractor

IDM Ingeniería y Construcción S.A.

Other participating companies

NDC

Protected object

Building, Infrastructure, Other

Corrosion protection

GEOBRUGG SUPERCOATING, INOX / STAINLESS

Your local contact

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / United States Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / United States

E-Mail

John Kalejta
 

John Kalejta

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,KS 67226 Wichita / United States

E-Mail

Bob Lyne
 

Bob Lyne

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / United States

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Natural Hazards
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Natural Hazards
Geobrugg North America, LLC,OR 97302 Salem / United States

E-Mail