Kiruna-LKAB 2016 - Geobrugg Kiruna-LKAB 2016 - Geobrugg
Kiruna-LKAB 2016 - Geobrugg Kiruna-LKAB 2016 - Geobrugg
Kiruna-LKAB 2016 - Geobrugg Kiruna-LKAB 2016 - Geobrugg
Kiruna-LKAB 2016 - Geobrugg Kiruna-LKAB 2016 - Geobrugg
Kiruna-LKAB 2016 - Geobrugg Kiruna-LKAB 2016 - Geobrugg
Kiruna-LKAB 2016 - Geobrugg Kiruna-LKAB 2016 - Geobrugg
Kiruna-LKAB 2016 - Geobrugg Kiruna-LKAB 2016 - Geobrugg
Kiruna-LKAB 2016 - Geobrugg Kiruna-LKAB 2016 - Geobrugg
Kiruna-LKAB 2016 - Geobrugg Kiruna-LKAB 2016 - Geobrugg

Kiruna-LKAB

view address in Google Maps  Share
Place
Kiruna
Country/Region
Sweden
Year of installation
2016
Customer
LKAB Luossavaara-Kiirunavaara Aktiebolag
Protected object
Infrastructure
Systems
ROMBO Mesh, MAXX Mesh
System height
N/A
Situation

For the open iron ore mine in Svappavaara, which lies southeast of Kiruna, the mine operator Luossavaara-Kiirunavaara Aktiebolag (LKAB) regularly conducts blasting. Five buildings with operationally relevant infrastructure require protection against falling rocks - persons, naturally, are evacuated in these cases.

Description

Sweco built steel scaffoldings for the buildings which house particularly relevant infrastructure. On top of these our nets MAXX S4-130 and ROMBO G80/4 were installed in two layers. They come along with the largest brakes: U300-rod brakes with a capacity of 3,000 kJ. Complete installation around the 3,400 m² protected area was completed in only six weeks.

 

Your local contact

Marcel Dünner
Marcel Dünner
Business Area Manager Safety Solutions
Impact protection
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Switzerland
Phone +41 71 466 84 70
Mobile +41 79 378 66 06

Contact form