Switzerland
Switzerland

myGeobrugg

Kaikoura State Highway (SR27) / Coastal Pacific Rail (NS15)

Debris Flow & Shallow Landslide Protection - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

NS15: Looking North SH1 - 126 m SL-150 with transmission rope protecting the road and rail corridor

Debris Flow & Shallow Landslide Protection - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

NS15: Looking South SH1 - 126 m SL-150 with transmission rope protecting the road and rail corridor

Debris Flow & Shallow Landslide Protection - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

SR27: Looking North SH1 - SL-150 with transmission rope protecting the road and rail corridor

Debris Flow & Shallow Landslide Protection - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

SR27: Looking South SH1 - SL-150 with transmission rope protecting the road and rail corridor

Debris Flow & Shallow Landslide Protection - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

Note the Barrier is built on top of a culvert to contain the debris material in the event of overtopping

Debris Flow & Shallow Landslide Protection - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

Slip 8, looking West and North SH1 - SL-150 protecting the road rail corridor

 

Systems

 

System length

24 m - 126 m

 

Year of installation

2019

Initial situation

The Kaikoura M7.8 Earthquake caused widespread damage to the road and rail corridor 20 km North and South of the Kaikoura township. Initially, more than 40 major slips inundated the road and rail with >750,000 m³ of material from source zones up to 500 metres above sea level. The loosened highly fractured Grey Wacke has caused subsequent frequent rockfalls, shallow landslides and debris loads.

The increased hazard associated with the frequent failures created a requirement to install shallow landslide barriers on several open slope locations to be able to maintain the SH1 road and Railway below. The major design constraint for the sites was minimising the deflection of the barrier in both rockfall and debris load events.

Description

The 3.5m high SL-150 barrier was selected due to its 150kN/m² load capacity with low defection (<2.2 metres in a debris load event) and due to it being the only tested and certified landslide barrier. To lower the deflection further for the maximum energy level (MEL) rockfall event, a custom transmission rope was designed and installed. The lower deflection was required due to the barriers close proximity to the railway.

To date, six SL-150s ranging from 24 metres to 126 metres long have been installed in the Kaikoura region with three of them having an additional transmission rope.

Customer

NCTIR / NZTA / KiwiRail

Contractor

Geovert, SRG, HGS, Ground Anchor Systems and Geotech

Protected object

Road, Railway

Corrosion protection

GEOBRUGG ULTRACOATING

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail