Switzerland
Switzerland

myGeobrugg

Kaikoura State Highway 1 (SR1-2)

Rockfall Protection - Kaikoura State Highway 1 (SR1-2) 2019

Looking north - 3 m high GBE-500A rockfall barrier

Rockfall Protection - Kaikoura State Highway 1 (SR1-2) 2019

Looking upslope - 50 meters long and 3 meters high GBE-500A rockfall barrier

Rockfall Protection - Kaikoura State Highway 1 (SR1-2) 2019

Looking upslope -support rope separation

Rockfall Protection - Kaikoura State Highway 1 (SR1-2) 2019

Looking north - 3 m high GBE-500A rockfall barrier . Note: downslope anchor for upslope change in direction

Rockfall Protection - Kaikoura State Highway 1 (SR1-2) 2019

Looking south - 3 m high GBE-500A rockfall barrier

Rockfall Protection - Kaikoura State Highway 1 (SR1-2) 2019

Looking North - 3 m high GBE-500A rockfall barrier installed above shotcrete and precast walls. SH1 and the Coastal Pacific rail is an important lifeline and transport route going North from Christchurch.

 

Systems

 

System length

100 m

 

Year of installation

2019

Initial situation

The Kaikoura M7.8 earthquake caused widespread damage to the road and rail corridor for approximately 20 km North and South of the Kaikoura township. Over forty major slips inundated the road and rail with more than 750'000 m³ of material from source zones up to 500 meters above sea level.  The highly fractured Grey Wacke means frequent future rockfalls and debris loads. The high rockfall frequency created the requirement for a geohazard solution at Site 1-2.

Description

The original design and installation was a 50 meters long 3 meters high GBE-500A barrier. After installation, the decision was made to install an additional 50 meters of barrier to protect the highway further. The system was easily extended by upgrading the northernmost post to a support rope separation with no material wastage.


The GBA-500A is a hinged post system. The barrier has upslope anchors, which reduce the post foundation forces and therefore minimise impact to the precast concrete wall and shotcrete retaining walls below. The rockfall barrier used a 10 meters post spacing, had two downslope anchors due to a curved alinement and as previously mentioned was split into two sections with a support rope separation. Due to the highly fractured rock mass, self-drilling anchors were required. Geobrugg type II flex heads transfer the loads to the bar anchors. The mesh was ultra-coated due to its proximity to the sea.

Customer

NCTIR and NZTA

Contractor

Rock Control

Protected object

Road

Corrosion protection

GEOBRUGG ULTRACOATING

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail