Kaikoura Coastal Pacific Rail (SK16)

Debris Flow & Shallow Landslide Protection - Kaikoura Coastal Pacific Rail (SK16) 2019

Looking West - VX080-H2 debris flow barrier with 16/3/300 ROCCO ringnet tail. Note proximity to rail and road.

Debris Flow & Shallow Landslide Protection - Kaikoura Coastal Pacific Rail (SK16) 2019

Looking South - VX080-H2 debris flow barrier with 16/3/300 ROCCO® ringnet tail.

Debris Flow & Shallow Landslide Protection - Kaikoura Coastal Pacific Rail (SK16) 2019

Looking upslope - VX080-H2 debris flow barrier with 16/3/300 ROCCO ringnet tail. Note abrasion protection on the top ropes.

Debris Flow & Shallow Landslide Protection - Kaikoura Coastal Pacific Rail (SK16) 2019

Looking upslope - VX080-H2 debris flow barrier with 16/3/300 ROCCO® ringnet tail under construction.

Debris Flow & Shallow Landslide Protection - Kaikoura Coastal Pacific Rail (SK16) 2019

Looking North - SH1 and the Coastal Pacific Rail is an important lifeline and transport route going North from Christchurch.

 

Systems

VX TECCO® G65/3 Special Solutions

 

System length

2 m - 10 m

 

Year of installation

2019

Initial situation

The Kaikoura M7.8 Earthquake caused widespread damage to the road and rail corridor for 20 km North and South of the Kaikoura township. Over 40 major slips inundated the road and rail with more than 750'000 m³ of material from source zones up to 500 m above sea level. The highly fractured Grey Wacke meant frequent future rockfalls and debris loads were expected. The high rockfall and debris load frequency created the requirement for a Geohazard Solution that attenuated the energy to a manageable level and then guided the material down to a catchment area. Space was limited due to the proximity of the Coastal Pacific rail line. The SK16 site is a narrow, incised catchment that extends about 150 m above road/rail level. The slope angle is about 50-55 degrees.

Description

A 10 meters wide VX080-H2 debris flow barrier was modified to include a 12 meters 16/3/300 ROCCO ring net tail. This system enabled the rockfall and debris energy to be attenuated and guided down to a catchment area at the toe of the slope for easier clearing and reduced maintenance.

Additional support ropes were also installed across the channel to minimise deflection onto the railway. The installation required abrasion protection on the top ropes due to the potential of it being overtopped in above design large events.

TECCO® G65/3 was used as a secondary mesh as a robust solution was required to avoid puncturing failures from the high frequency of smaller high-velocity rocks.

Country/Region

New Zealand

Customer

KiwiRail

Contractor

Rock Control

Protected object

Railway

Corrosion protection

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Natural Hazards
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland , Msc. Env. Eng.

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Switzerland Country Manager Southern Switzerland

E-Mail