Imogiri Royal Cemetery, Yogyakarta

Slope Stability - Imogiri Royal Cemetery, Yogyakarta 2020

A few weeks after installation, in January 2021, the stabilizing mesh has become invisible, the slope looks natural - protection of the local villagers and go-green aspect.

Slope Stability - Imogiri Royal Cemetery, Yogyakarta 2020

Initial condition of the slope, before clearing

Slope Stability - Imogiri Royal Cemetery, Yogyakarta 2020

The Sugengan, a traditional Royal Yogyakarta ceremony for initiating the project

Slope Stability - Imogiri Royal Cemetery, Yogyakarta 2020

The slope after clearing

Slope Stability - Imogiri Royal Cemetery, Yogyakarta 2020

Drilling soil nails

Slope Stability - Imogiri Royal Cemetery, Yogyakarta 2020

Drilling soil nails

Slope Stability - Imogiri Royal Cemetery, Yogyakarta 2020

Grouting

Slope Stability - Imogiri Royal Cemetery, Yogyakarta 2020

Installation of the mesh rolls - they do roll!

Slope Stability - Imogiri Royal Cemetery, Yogyakarta 2020

Installation of the spike plates and tightening the nuts using a torque wrench

Slope Stability - Imogiri Royal Cemetery, Yogyakarta 2020

Completed installation in December 2020; re-vegetation has already started

Slope Stability - Imogiri Royal Cemetery, Yogyakarta 2020

The stabilized slope end of February with a very natural look.

 

Systems

 

Year of installation

2020

Initial situation

On the north slope of Imogiri hill, a considerable risk potential had to be faced. Slope failures can cause damages to the Imogiri Royal Cemetery on the top of the hill. Also, they threaten villagers who live and work at the hill’s toe.

Geology

Weathered rock and andesite

Description

For stabilization system with steel wire mesh was installed to stabilize the slope. The system is proven, efficient, and reliable. It has little visible impact and respects ecological aspects.

Customer

Kraton Yogyakarta

Contractor

PT. Triputri Sukses Mandiri

Protected object

Building, Infrastructure, Art

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

PT. Tri Patra Konsultan (designer), PT. Cipta Adi Tama (supervisor)

Your local contact

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / United States Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / United States Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / United States Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Natural Hazards
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / United States Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Natural Hazards
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Natural Hazards
Geobrugg North America, LLC,Salem OR 97302 / United States Sales Director

E-Mail