Switzerland
Switzerland

myGeobrugg

Debris Flow & Shallow Landslide Protection - Glen Eyrie 2013

View of UX/VX debris barrier looking upstream from below

Debris Flow & Shallow Landslide Protection - Glen Eyrie 2013

Access road built to the right side of the UX/VX debris barrier for easy clean out

Debris Flow & Shallow Landslide Protection - Glen Eyrie 2013

View from behind UX /VX debris barrier looking downstream

Debris Flow & Shallow Landslide Protection - Glen Eyrie 2013

Notable-Scour-of-channel-bed-shotcrete

Debris Flow & Shallow Landslide Protection - Glen Eyrie 2013

Lower barrier, where VX and UX meet. The VX barrier is almost full. Also shows UX nets over top of VX nets

 

System length

12 m - 25 m

 

Year of installation

2013

Initial situation

The Waldo Canyon Fire burned approximately 18,200 acres in the summer of 2012. A significant portion of the upper watershed of Queen's Canyon was located within the burn scar of the Waldo Canyon Fire. The Glen Eyrie Castle and Conference Center are located at the mouth of The Queen's Canyon, exposing the Conference Center to post-wildfire debris flows.

Description

A total of 3 Geobrugg debris flow barriers, 2 UX barriers (UX120-H6 and UX180-H6) and one VX barrier ( VX080-H4) were installed at the project site. The VX barrier was installed directly below the UX180-H6. A reinforced earth berm was also constructed at this site to create a narrower channel as well as an access road that would later be used for barrier clean out.

The UX120-H6 barrier is planned to be left in place and once filled, be used as a check dam, while the VX080-H4 and UX180 H-6 have since been cleaned out a handful of times using the constructed access road.

Customer

The Navigators

Contractor

Midwest Rockfall, Inc.

Protected object

Building, Touristic infrastructure, Infrastructure, Other

Engineering

Kane GeoTech

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail