Slope Stability - Fierza Hydroelectric Power Station #3 2014

Slope protected with TECCO® G65/3 mesh and TECMAT®.

Slope Stability - Fierza Hydroelectric Power Station #3 2014

Drilling work and nail installation.

Slope Stability - Fierza Hydroelectric Power Station #3 2014

Drilling work and nails installation completed with a "Spider" machine.

Slope Stability - Fierza Hydroelectric Power Station #3 2014

Installation using a drilling machine always requires a two-man crew.

Slope Stability - Fierza Hydroelectric Power Station #3 2014

Slope protected with TECCO® G65/3 mesh and TECMAT®.

Slope Stability - Fierza Hydroelectric Power Station #3 2014

TECCO® G65/3 high-tensile steel mesh is very light weight, allowing helicopter installation.

 

Year of installation

2014

Initial situation

Slope instability on the lake sides had to be stabilized.

Description

Slope stabilization with TECCO® System with TECCO® G65/3 mesh with TECMAT® for erosion control.

Stabilization of single boulder with SPIDER® S4-230 net.

Customer

KESH Albania

Contractor

Cresta Geo Switzerland

Protected object

Road, Building

Corrosion protection

GEOBRUGG SUPERCOATING

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail