Coquitlam-Bunzten Tunnel Gate Replacement

Coquitlam Reservoir, Coquitlam, BC, Canada, Canada
2021
Customer
Engineering
Dr. Duncan Wyllie, P.Eng
Other participating companies
Protected object
Mine / Quarry, Infrastructure, Other
Energy absorption capacity
2000 kJ
System height
7.0 m
System length
42 m
Corrosion protection
Galvanized, GEOBRUGG SUPERCOATING
Initial situation

RXE-2000 barrier system needed to be installed to protect a tunnel portal, lay down area,  ventilation, and power sources. Barrier protects equipment as well as infrastructure. 

Description

Geobrugg delivered a 42m long, with 7m tall posts RXE-2000 Barrier at the end of December 2020. Project was completed, with great teamwork, January 2021.

Your local contact

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Natural Hazards
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / United States
Saleh Feidi
Saleh Feidi
Regional Manager California
Natural Hazards
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / United States
John Kalejta
John Kalejta
Regional Manager Central US
Natural Hazards
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / United States
Bob Lyne
Bob Lyne
Regional Manager Southeast
Natural Hazards
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / United States
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Natural Hazards
Geobrugg North America, LLC
22 Centro Algodones
Tim Shevlin
Tim Shevlin
Sales Director
Natural Hazards
Geobrugg North America, LLC
Salem OR 97302 / United States