Switzerland
Switzerland

myGeobrugg

Slope Stability - Bridger Coal Mine 2004

Protective mesh installed on the rockface slope

Slope Stability - Bridger Coal Mine 2004

Installation of TECCO® G65/3

Slope Stability - Bridger Coal Mine 2004

Installed TECCO®

Slope Stability - Bridger Coal Mine 2004

Mesh covering the rock

 
 

Year of installation

2004

Initial situation

At this open pit mine, tunnel portals were put to go underground to follow coal seams. These tunnel portals are located at the bottom of a high wall.

Description

The high wall was draped with TECCO® System mesh to protect personnel and equipment during construction and operation of the portals.

Customer

Private

Contractor

Yenter Companies

Protected object

Mine / Quarry

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

Seegmiller International

Other installed applications

Underground & Open Pit Mining

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail