Blast Protection Mesh 2005 - Geobrugg Blast Protection Mesh 2005 - Geobrugg
Blast Protection Mesh 2005 - Geobrugg Blast Protection Mesh 2005 - Geobrugg
Blast Protection Mesh 2005 - Geobrugg Blast Protection Mesh 2005 - Geobrugg

Blast Protection Mesh

view address in Google Maps  Share
Place
Linz
Country/Region
Austria
Year of installation
2005
Customer
DSM Linz
Engineering
Geobrugg Security Engineering
Systems
SATURN Ring Net, ROMBO Mesh
System height
N/A
Situation

-

Description

Explosion protection for the chemical industry. Problem: Producing a substance from several components is a delicate process that can result in overloads. The bursting of a production installation is protected by a concrete tower open at the top, which resists the detonation pressure and directs it upwards. The opening must also protect against flying debris. Special requirements: Protection against flying debris from the burst installation must be strong enough to retain it but at the same time open enough to allow the detonation pressure to escape. Geobrugg’s answer: A steel frame cage with combined SATURN/ ROMBO mesh, placed over the frame structure is sufficiently permeable to the detonation pressure but strong enough to stop debris flying at a very high velocity.

Your local contact

Marcel Dünner
Marcel Dünner
Business Area Manager Safety Solutions
Impact protection
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Switzerland
Phone +41 71 466 84 70
Mobile +41 79 378 66 06

Contact form