Switzerland
Switzerland

myGeobrugg

Beartooth Highway Debris Flow

Debris Flow & Shallow Landslide Protection - Beartooth Highway Debris Flow 2003

Site overview

Debris Flow & Shallow Landslide Protection - Beartooth Highway Debris Flow 2003

Modified RXI-200 debris flow barrier

Debris Flow & Shallow Landslide Protection - Beartooth Highway Debris Flow 2003

Debris flow channel

Debris Flow & Shallow Landslide Protection - Beartooth Highway Debris Flow 2003

Modified RXI-200 debris flow barrier

Debris Flow & Shallow Landslide Protection - Beartooth Highway Debris Flow 2003

View of upslope support ropes with brake ring on modified RXI-200 debris flow barrier

 

System length

25 m - 40 m

 

Year of installation

2003

Initial situation

A massive debris flow had closed the road which is one of the main access routes to Yellowstone National Park. 

Description

Three separate sections of modified RXI barriers were installed to mitigate the debris flow hazard.  Three system sizes:

40 linear meters at 7.5 meters high
40 meters at 6 meters high
25 meters at 4.5 metesr high.

Customer

Montana Transportation Department

Contractor

HI-Tech Rockfall Construction

Protected object

Road

Engineering

Shannon & Wilson - Seattle, Washington

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail