스위스
스위스

myGeobrugg

비탈면 보강 시스템 - Cucunuba walking path 2017

The steep walking path lies underneath the stabilized slope

비탈면 보강 시스템 - Cucunuba walking path 2017

TECCO® GREEN after installation

비탈면 보강 시스템 - Cucunuba walking path 2017

The mesh with the erosion control mat perfectly adapts to the uneven ground

비탈면 보강 시스템 - Cucunuba walking path 2017

Looking down the stabilized slope

 

Year of installation

2017

Situation

The client had identified several points of instability located along the path to the Chapel of Our Lady of Lourdes in the Cucunuba municipality. The risk was due to material falling on a path that is regularly used by visitors to the town

Geology

Residual soil and some levels of weathered rock that appear on the surface.

Description

To enable a fast re-vegetation, TECCO® GREEN was installed. This system integrates a high resistance mesh and an erosion control mat. It significantly reduces installation time and enables a rapid greening process throughout the slope.

Customer

Corporacion Autonoma Regional

Protected object

Road, Touristic infrastructure

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail