Schweiz
Schweiz

myGeobrugg

Böschungsstabilisierung - Yongduam 2015

Protected visitors at Yongduam

Böschungsstabilisierung - Yongduam 2015

Safe walking paths

 

Installationsjahr

2015

Ausgangslage

On Jeju Island, erosion formed a 10 meters high rock into a dragon's head. Yongduam is one of the main tourist attractions of the region. Rockslides threatened sightseers on the surrounding walkways.

For stabilization, the city of Jeju needed an erosion proof solution. The solution should not compromise the scenic beauty of the area.

Massnahme

TECCO® G65/3 STAINLESS was installed in December 2015. 4 meter long galvanized 28 mm nails at intervals of 4 meters (horizontally and vertically) are fixing the mesh. The mesh was colored green and thus is unobtrusive.

Kunde

*

Geschützte Objekte

Touristische Infrastruktur

Korrosionsschutz

INOX / STAINLESS

Ansprechpartner

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Stabile Cometal, via Pizzante 7,6595 Riazzino / Schweiz Ticino Country Manager

E-Mail