Böschungsstabilisierung - Yellowstone 2022

View of the area

Böschungsstabilisierung - Yellowstone 2022

Start of the reconstruction work of the damaged roadways

Böschungsstabilisierung - Yellowstone 2022

Work in progress for the slope stabilization system

Böschungsstabilisierung - Yellowstone 2022

Final touches on the TECCO Green

 

Installationsjahr

2022

Ausgangslage

In June 2022, Yellowstone National Park experienced historic flooding – damaging roads, water and wastewater systems, electrical infrastructure and other critical park infrastructure. To help with the reconstruction of the damaged roadways, GeoStabilization International was awarded two emergency design-build contracts for slope stabilization.
 

Massnahme

The first works were done on the Old Gardiner Road Bypass at Mammoth Hot Springs, where damage at the Park’s North Entrance, cut off access to Gardiner, Montana. Approximately 20,000 square feet (1860 m2) of pinned mesh stabilized the slope, using our TECCO Green G65/3 to help promote revegetation.
 
The second included a buildout of approximately 120 linear feet (35 m) of the roadway at the East Entrance Gates adjacent to Middle Creek where flooding caused erosion of the bank and placed US Highway 14 in Wyoming at risk.

 

The pictures were provided by GeoStabilization International.

Ausführende Firma

Geschützte Objekte

Strasse, Touristische Infrastruktur, Infrastruktur

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail