Schweiz
Schweiz

myGeobrugg

Böschungsstabilisierung - Waiheke Island (1) 2018

View from above - TECCO® STAINLESS G65/3 with stainless P33/50 spike plates - Note tree holes and proximity to the sea

Böschungsstabilisierung - Waiheke Island (1) 2018

View from above - TECCO® STAINLESS G65/3 with stainless P33/50 spike plates - Note tree holes

 

Installationsjahr

2018

Ausgangslage

Erosion and subsequent slumping of the slope below a coastal property required a corrosion resistant solution to actively support the slope and prevent further undercutting. The rehabilitation area was 600 m².

Massnahme

The mesh selected was TECCO® STAINLESS G65/3 due to its strength properties, superior corrosion resistance (stainless), low visibility, uniform strength for anchor placement and speed of installation. The TECCO® SYSTEM also allowed tree holes to be cut for planting of the slope.

Kunde

Private

Ausführende Firma

Groundfix

Geschützte Objekte

Gebäude

Korrosionsschutz

INOX / STAINLESS

Ansprechpartner

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Stabile Cometal, via Pizzante 7,6595 Riazzino / Schweiz Ticino Country Manager

E-Mail