USA
USA

myGeobrugg

Böschungsstabilisierung - Tortola 2017

The slope in perfect state after the hurricane season 2017

Böschungsstabilisierung - Tortola 2017

The slope before the erosion control solution was installed

 

Systeme

 

Installationsjahr

2017

Ausgangslage

After a tropical storm this slope behind a house showed erosion problems

Geologie

Soil layer

Massnahme

The contractor proposed an erosion control with DELTAX® mesh plus erosion control mat. They were fixed to the slope with 2-meter bolts.

Kunde

n.a.

Ausführende Firma

Precision Blasting & Construction Ltd.

Geschützte Objekte

Wohngebiet

Korrosionsschutz

GEOBRUGG ULTRACOATING

Planer

Revo Skelton

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail