USA
USA

myGeobrugg

Slope protection along railway line M502 Šapjane-Permani

Böschungsstabilisierung - Slope protection along railway line M502 Šapjane-Permani 2015

Zaštićen pokos TECCO® G65/3 nosivom mrežom.

Böschungsstabilisierung - Slope protection along railway line M502 Šapjane-Permani 2015

.

Böschungsstabilisierung - Slope protection along railway line M502 Šapjane-Permani 2015

.

 
 

Installationsjahr

2015

Ausgangslage

Rockfalls from a very steep cut endangering railway line.

Massnahme

Slope active protection with TECCO® SYSTEM3 high tensile mesh combined with nailing.

Kunde

.

Ausführende Firma

Octopus Rijeka

Geschützte Objekte

Eisenbahn

Korrosionsschutz

GEOBRUGG SUPERCOATING

Planer

Geotech Rijeka

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail