USA
USA

myGeobrugg

Shimizu district North-South

Böschungsstabilisierung - Shimizu district North-South 2016

23'770 m² of high tensile TECCO® G65/3 mesh with GEOBRUGG SUPERCOATING® + PET corrosion protection covers the slope today - with minimal visual impact

Böschungsstabilisierung - Shimizu district North-South 2016

Before installation of high tensile TECCO® G65/3 mesh - the slope is already nailed and covered with anti-erosion mat

Böschungsstabilisierung - Shimizu district North-South 2016

Closer view of the fully protected slope - the slope is getting a natural look

Böschungsstabilisierung - Shimizu district North-South 2016

After installation - showing the dimension of the whole project

Böschungsstabilisierung - Shimizu district North-South 2016

Panorama view with TECCO® installation in the background - roads and rivers in the valley are protected now

 
 

Installationsjahr

2016

Ausgangslage

The typhoon no. 12 that crossed West Japan in September 2011 brought torrential rain to the Gojo Nara area and caused largescale landslides. The collapsed earth and sand flowed into the rising river, and even reached the opposite shore.

Massnahme

For the restoration of the collapsed area, Kumonosu Net using high tensile steel wire mesh TECCO® System was selected taking into account the large number of installation results, reasonable design and price, workability at high place, quick installation and landscape.

Kunde

Kii Mountain District SABO Office

Geschützte Objekte

Strasse, Wohngebiet

Korrosionsschutz

GEOBRUGG SUPERCOATING + PET

Planer

Japan Conservation Engineers & Co.,Ltd.

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail