Böschungsstabilisierung - Selo Boyolali 2016

The TECCO® high tensile steel wire mesh stabilizes the steep Lahar slope. Vegetation is already covering the steep hill. The anchored concrete beam at the top absorbs the traffic load and acts as a stiffening element.

Böschungsstabilisierung - Selo Boyolali 2016

Rolling down the TECMAT® erosion control and the TECCO® high tensile steel wire net. Diamond shaped spike plates attach the net. Due to the optimized nail pattern, this took only a couple of days.

Böschungsstabilisierung - Selo Boyolali 2016

The completed TECCO® slope stabilization. It took the team only four months - congratulations!

Böschungsstabilisierung - Selo Boyolali 2016

Frontal view onto the impressive bamboo scaffold: traditional methods meeting newest technologies

Böschungsstabilisierung - Selo Boyolali 2016

The entirely green, completely revegetated slope in 2020

 

Installationsjahr

2016

Ausgangslage

Jembatan Samiran road lies approximately 35 kilometers west from Surakarta. The road widening project that connects Magelang and Boyolali cuts travel time and helps to spur economic growth in the area. In the past, the operation got constraint massively by the occurrence of large slope failure, in which one road lane slipped down to the creek. The site is troublesome due to its steepness and geological condition, due to the intense rainy season and frequent earthquakes.

The road engineers decided on a new effective solution, tested and withstanding the harshness of the site, actively and permanently stabilizing the problematic embankment. Quickly and safely installed in respect of the challenging accessibility. Moreover, blending in with nature: TECCO® System.

TECCO® System is a permanent and active slope stabilization system made of high tensile steel wire mesh in combination with soil nailing or rock bolting.

Geologie

Lahar

Massnahme

After the stakeout in collaboration with local experts and Geobrugg engineers, five hardworking drilling team completed drilling works in less than four months. Given the demanding weather conditions, this is an astonishing performance.

2'500 sqm of slope stabilization with TECCO® System mesh and hydroseeding were completed within two weeks.


Green Rehabilitator, the expert in landscape & erosion control services from Semarang, executed the hydroseeding.

Kunde

Bina Marga

Geschützte Objekte

Strasse, Touristische Infrastruktur

Korrosionsschutz

GEOBRUGG SUPERCOATING

Subunternehmer

PT. Amavi

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail