Schweiz
Schweiz

myGeobrugg

Reconstruction of the National Road D 201-Buzet - GP Požane

Böschungsstabilisierung - Reconstruction of the National Road D 201-Buzet - GP Požane 2015

Installation of Deltax G80/2 mesh on the cliff.

Böschungsstabilisierung - Reconstruction of the National Road D 201-Buzet - GP Požane 2015

Drilling for the nails on the cliff.

Böschungsstabilisierung - Reconstruction of the National Road D 201-Buzet - GP Požane 2015

Testing of the self-drilling anchors.

 
 

Installationsjahr

2015

Ausgangslage

Rockfalls from the cliff were endangering the road below. Because rockfalls are rather small this lightweight solution is ideal.

Geologie

Limestone cliff with eroded superficial area (causing small rockfalls).

Massnahme

Slope protection with Deltax G80/2.

Kunde

Hrvatske Ceste

Ausführende Firma

Monterra Rijeka

Geschützte Objekte

Strasse

Korrosionsschutz

GEOBRUGG SUPERCOATING

Planer

Via-ing Pula

Ansprechpartner

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Stabile Cometal, via Pizzante 7,6595 Riazzino / Schweiz Ticino Country Manager

E-Mail