Schweiz
Schweiz

myGeobrugg

Böschungsstabilisierung - Paseo San Nicolás 2018

The slope with TECCO® G65/3

Böschungsstabilisierung - Paseo San Nicolás 2018

Staking out the drilling points

 
 

Installationsjahr

2018

Ausgangslage

In the residential area of San Nicolas, superficial problems of instability occurred in 2017. The real estate developer of the project asked for a solution to protect the back yards of some houses, which were already inhabited.

Geologie

Lime soil layer.

Massnahme

A superficial stabilization with TECCO® G65/3, erosion control mat and nails between 3 to 6 meters was installed.

Kunde

Portales de Nuevo Emperador S.A.

Ausführende Firma

NDC

Geschützte Objekte

Wohngebiet

Korrosionsschutz

GEOBRUGG SUPERCOATING

Planer

Eng. José Harris

Ansprechpartner

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Stabile Cometal, via Pizzante 7,6595 Riazzino / Schweiz Ticino Country Manager

E-Mail