USA
USA

myGeobrugg

Steinschlagschutz - Ojo Caliente New Mexico 2012

Final installation of the SPIDER® S4-230 Rockfall Impact Attenuator along Highway 111

Steinschlagschutz - Ojo Caliente New Mexico 2012

Rockfall along the Highway 111 before the installation

Steinschlagschutz - Ojo Caliente New Mexico 2012

Wedge areas before the installation - visible rockfall triggering mechanism

Steinschlagschutz - Ojo Caliente New Mexico 2012

Another perspective view of the SPIDER® S4-230 Rockfall Impact Attenuator along Highway 111

 

Systeme

 

Systemlänge

60 m - 60 m

 

Installationsjahr

2012

Ausgangslage

The section of Highway 111 near Mile Marker 2 located near Ojo Calienete, New Mexico required rockfall mitigation. In order to mitigate the rockfall hazard, the New Mexico Department of Transportation (District 5) consulted with Golder & Associates to develop a plan. Based upon the site conditions, Golder recommended an attenuator system.

Massnahme

Geobrugg provided 180 feet attenuator system. The attenuator system infrastructure consists of a 2 meters high RXI-050 system using a SPIDER® S4-130 high-tensile steel wire net from ground level to the post height. A SPIDER® S4-230 high-tensile wire net is used for the drape, which extends to approximately 40 feet below the post section down the face of the slope.

Kunde

New Mexico Department of Transportation

Ausführende Firma

Janod, Inc.

Geschützte Objekte

Strasse

Korrosionsschutz

Verzinkt, GEOBRUGG SUPERCOATING

Planer

Golder & Associates, Mike Pengam

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail