Kaikoura Coastal Pacific Rail (SK16)

Hangmuren- und Murgangschutz - Kaikoura Coastal Pacific Rail (SK16) 2019

Looking West - VX080-H2 debris flow barrier with 16/3/300 ROCCO ringnet tail. Note proximity to rail and road.

Hangmuren- und Murgangschutz - Kaikoura Coastal Pacific Rail (SK16) 2019

Looking South - VX080-H2 debris flow barrier with 16/3/300 ROCCO® ringnet tail.

Hangmuren- und Murgangschutz - Kaikoura Coastal Pacific Rail (SK16) 2019

Looking upslope - VX080-H2 debris flow barrier with 16/3/300 ROCCO ringnet tail. Note abrasion protection on the top ropes.

Hangmuren- und Murgangschutz - Kaikoura Coastal Pacific Rail (SK16) 2019

Looking upslope - VX080-H2 debris flow barrier with 16/3/300 ROCCO® ringnet tail under construction.

Hangmuren- und Murgangschutz - Kaikoura Coastal Pacific Rail (SK16) 2019

Looking North - SH1 and the Coastal Pacific Rail is an important lifeline and transport route going North from Christchurch.

 

Systeme

VX TECCO® G65/3 Sonderlösungen

 

Systemlänge

2 m - 10 m

 

Installationsjahr

2019

Ausgangslage

The Kaikoura M7.8 Earthquake caused widespread damage to the road and rail corridor for 20 km North and South of the Kaikoura township. Over 40 major slips inundated the road and rail with more than 750'000 m³ of material from source zones up to 500 m above sea level. The highly fractured Grey Wacke meant frequent future rockfalls and debris loads were expected. The high rockfall and debris load frequency created the requirement for a Geohazard Solution that attenuated the energy to a manageable level and then guided the material down to a catchment area. Space was limited due to the proximity of the Coastal Pacific rail line. The SK16 site is a narrow, incised catchment that extends about 150 m above road/rail level. The slope angle is about 50-55 degrees.

Massnahme

A 10 meters wide VX080-H2 debris flow barrier was modified to include a 12 meters 16/3/300 ROCCO ring net tail. This system enabled the rockfall and debris energy to be attenuated and guided down to a catchment area at the toe of the slope for easier clearing and reduced maintenance.

Additional support ropes were also installed across the channel to minimise deflection onto the railway. The installation required abrasion protection on the top ropes due to the potential of it being overtopped in above design large events.

TECCO® G65/3 was used as a secondary mesh as a robust solution was required to avoid puncturing failures from the high frequency of smaller high-velocity rocks.

Kunde

KiwiRail

Ausführende Firma

Rock Control

Geschützte Objekte

Eisenbahn

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail