Schweiz
Schweiz

myGeobrugg

Kaikoura Coastal Pacific Rail (SH1)

Hangmuren- und Murgangschutz - Kaikoura Coastal Pacific Rail (SH1) 2019

Looking West - VX080-H4 debris flow barrier with 12/3/350 ROCCO® ring net tail - note proximity to rail

Hangmuren- und Murgangschutz - Kaikoura Coastal Pacific Rail (SH1) 2019

Looking North - VX080-H4 debris flow barrier with 12/3/350 ROCCO® ringnet tail - note proximity to rail

Hangmuren- und Murgangschutz - Kaikoura Coastal Pacific Rail (SH1) 2019

VX080-H4 - debris accumulation as per design in the catchment ditch after moderate rain

Hangmuren- und Murgangschutz - Kaikoura Coastal Pacific Rail (SH1) 2019

Debris flow barrier to ROCCO® tail connection

Hangmuren- und Murgangschutz - Kaikoura Coastal Pacific Rail (SH1) 2019

Drape Support ropes to assist lower engery material to pass through

 

Systeme

VX VX080-H4 Sonderlösungen

 

Installationsjahr

2019

Ausgangslage

The 2016 Kaikoura M7.8 earthquake caused widespread damage to the road and rail corridor some 20 km North and South of the Kaikoura township. Over 40 major slips inundated the road and rail with over 750'000 m³ of material from source zones up to 500 m above sea level. The highly fractured Grey Wacke means frequent future rockfalls and debris loads are to be expected. The high rockfall and debris load frequency created the requirement for a Geohazard Solution that attenuated the energy to a manageable level and guided the material down to a catchment area. Due to the proximity of the Coastal Pacific rail line space is limited.

Massnahme

A VX080-H4  debris flow barrier was combined with a 12/3/350 ROCCO ring net tail. This system enables the rockfall and debris energy to be attenuated and guided down to a catchment area at the toe of the slope for easier clearing and reduced maintenance. Additional support ropes were also installed across the channel under the ROCCO® tail where it rested on the slope to enable the lower energy material to pass under and not get caught up. Short 0.5 m tethers were installed in the lower part of the tail to stop it from kicking out towards the rail in the larger energy events. TECCO® G65/3 was used as a secondary mesh as a robust solution was required due to the high frequency of the smaller high-velocity rocks.
Shortly after completion, the system demonstrated itself to be working well.

Kunde

KiwiRail

Ausführende Firma

Geovert

Geschützte Objekte

Eisenbahn

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Stabile Cometal, via Pizzante 7,6595 Riazzino / Schweiz Ticino Country Manager

E-Mail