Imogiri Royal Cemetery, Yogyakarta

Böschungsstabilisierung - Imogiri Royal Cemetery, Yogyakarta 2020

A few weeks after installation, in January 2021, the stabilizing mesh has become invisible, the slope looks natural - protection of the local villagers and go-green aspect.

Böschungsstabilisierung - Imogiri Royal Cemetery, Yogyakarta 2020

Initial condition of the slope, before clearing

Böschungsstabilisierung - Imogiri Royal Cemetery, Yogyakarta 2020

The Sugengan, a traditional Royal Yogyakarta ceremony for initiating the project

Böschungsstabilisierung - Imogiri Royal Cemetery, Yogyakarta 2020

The slope after clearing

Böschungsstabilisierung - Imogiri Royal Cemetery, Yogyakarta 2020

Drilling soil nails

Böschungsstabilisierung - Imogiri Royal Cemetery, Yogyakarta 2020

Drilling soil nails

Böschungsstabilisierung - Imogiri Royal Cemetery, Yogyakarta 2020

Grouting

Böschungsstabilisierung - Imogiri Royal Cemetery, Yogyakarta 2020

Installation of the mesh rolls - they do roll!

Böschungsstabilisierung - Imogiri Royal Cemetery, Yogyakarta 2020

Installation of the spike plates and tightening the nuts using a torque wrench

Böschungsstabilisierung - Imogiri Royal Cemetery, Yogyakarta 2020

Completed installation in December 2020; re-vegetation has already started

Böschungsstabilisierung - Imogiri Royal Cemetery, Yogyakarta 2020

The stabilized slope end of February with a very natural look.

 

Systeme

 

Installationsjahr

2020

Ausgangslage

On the north slope of Imogiri hill, a considerable risk potential had to be faced. Slope failures can cause damages to the Imogiri Royal Cemetery on the top of the hill. Also, they threaten villagers who live and work at the hill’s toe.

Geologie

Weathered rock and andesite

Massnahme

For stabilization system with steel wire mesh was installed to stabilize the slope. The system is proven, efficient, and reliable. It has little visible impact and respects ecological aspects.

Kunde

Kraton Yogyakarta

Ausführende Firma

PT. Triputri Sukses Mandiri

Geschützte Objekte

Gebäude, Infrastruktur, Kunst

Korrosionsschutz

GEOBRUGG SUPERCOATING

Planer

PT. Tri Patra Konsultan (designer), PT. Cipta Adi Tama (supervisor)

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail