Schweiz
Schweiz

myGeobrugg

Hangmuren- und Murgangschutz - Glen Eyrie 2013

View of UX/VX debris barrier looking upstream from below

Hangmuren- und Murgangschutz - Glen Eyrie 2013

Access road built to the right side of the UX/VX debris barrier for easy clean out

Hangmuren- und Murgangschutz - Glen Eyrie 2013

View from behind UX /VX debris barrier looking downstream

Hangmuren- und Murgangschutz - Glen Eyrie 2013

Notable-Scour-of-channel-bed-shotcrete

Hangmuren- und Murgangschutz - Glen Eyrie 2013

Lower barrier, where VX and UX meet. The VX barrier is almost full. Also shows UX nets over top of VX nets

 
 

Systemlänge

12 m - 25 m

 

Installationsjahr

2013

Ausgangslage

The Waldo Canyon Fire burned approximately 18,200 acres in the summer of 2012. A significant portion of the upper watershed of Queen's Canyon was located within the burn scar of the Waldo Canyon Fire. The Glen Eyrie Castle and Conference Center are located at the mouth of The Queen's Canyon, exposing the Conference Center to post-wildfire debris flows.

Massnahme

A total of 3 Geobrugg debris flow barriers, 2 UX barriers (UX120-H6 and UX180-H6) and one VX barrier ( VX080-H4) were installed at the project site. The VX barrier was installed directly below the UX180-H6. A reinforced earth berm was also constructed at this site to create a narrower channel as well as an access road that would later be used for barrier clean out.

The UX120-H6 barrier is planned to be left in place and once filled, be used as a check dam, while the VX080-H4 and UX180 H-6 have since been cleaned out a handful of times using the constructed access road.

Land/Region

USA

Kunde

The Navigators

Planer

Kane GeoTech

Ausführende Firma

Midwest Rockfall, Inc.

Geschützte Objekte

Gebäude, Touristische Infrastruktur, Infrastruktur, Sonstige

Ansprechpartner

René Müller
   

René Müller

Country Manager Western Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Fernüberwachung
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Umweltingenieur

Naturgefahren
Uferschutz/Wasserbau
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz , Msc. Env. Eng. Umweltingenieur

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Via Brusada 5,6933 Muzzano / Schweiz Country Manager Southern Switzerland

E-Mail