Ausgangslage

Following the instability of several areas of chalk cliff face adjacent to London Road, RSK was appointed as a designer to assess the slope instability and form a remediation strategy for the area. Risk areas were the footpath running along the base of the site as well as London Road atop the cliff with undermining of the road a possibility if protective measures were not put in place.

Geologie

Lewes Nodular Chalk Formation

Massnahme

The site was divided up into three sections, the first was a smaller mound of limestone approximately 8 metres in height, 15 metres wide and made up of three visible sides, rock bolted and meshed using TECCO G65/3 and TECCO GREEN. 

The main section of works comprised the cliff directly below London Road, the chalk in this area was around 20 metres in height, with the section running almost 100 metres. Drilling conditions on site were generally good with no flint bands present in the limestone, and a combination of grout and air flush was used. In total 630 holes were drilled across the site.

CAN Ltd was appointed as the contractor responsible for installation of the protective measures

Kunde

Ausführende Firma

Geschützte Objekte

Strasse, Wohngebiet

Korrosionsschutz

GEOBRUGG SUPERCOATING

Planer

RSK

Ansprechpartner

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Stabile Cometal, via Pizzante 7,6595 Riazzino / Schweiz Ticino Country Manager

E-Mail