City of Atlanta Water Supply

Böschungsstabilisierung - City of Atlanta Water Supply 2016

Northerly view of quarry slope to be protected - visible preparations for TBM deployment. Photo thanks to courtesy of Scarptec Inc.

Böschungsstabilisierung - City of Atlanta Water Supply 2016

Installation of high tensile steel TECCO® G65/3 drape. Photo thanks to courtesy of Scarptec Inc.

Böschungsstabilisierung - City of Atlanta Water Supply 2016

Another perspective of drape system being installed. Note painted drilling point for rock bolts used to secure larger boulder. Photo thanks to courtesy of Scarptec Inc.

Böschungsstabilisierung - City of Atlanta Water Supply 2016

View of GBE-1000A rockfall barrier line serving as rockfall canopy directly above TBM entry portal. TECCO® drape secured locally to capture rocks. Photo thanks to courtesy of Scarptec Inc.

Böschungsstabilisierung - City of Atlanta Water Supply 2016

View from below of the GBE-1000A rockfall barrier with hinged posts allowing easy slope morphology adjustments. Photo thanks to courtesy of Scarptec Inc.

 

Installationsjahr

2016

Ausgangslage

Bellwood Quarry outside of Atlanta (GA) will now be used for City of Atlanta water supply. In preparation to house the water supply and construct the distribution tunnel system a temporary and permanent system needed to be designed to protect workers, equipment and infrastructure from rocks falling off the 315 ft high and 365 ft long north facing slope. An additional temporary solution also needed to be implemented to protect workers and equipment at the tunnel portal.

Geologie

Granite

Massnahme

The solution was a 114 000 ft² TECCO® G65/3 drape system and two GBE-1000A rockfall barriers forming canopies. The challenge was to provide a feasible and cost effective solution that could be strong enough to contain rocks 2.5 ft in diameter falling from 285 ft. The system had to be strong yet light weight enough for effective installation. The GBE-1000A systems were bolted to the rockface with the TECCO® G65/3 drape tied locally to ensure capture of the rock. Larger boulders were secured with rock bolts to reduce system requirements. The drape will be left after the site is filled to contain underwater rockfall. The canopies will be removed. 

Learn more about the project: 
City of Atlanta Department of Watershed management (YouTube)

Kunde

City of Atlanta

Ausführende Firma

Guy F. Atkinson Construction LLC

Geschützte Objekte

Steinbruch / Bergbau, Infrastruktur

Korrosionsschutz

Verzinkt, GEOBRUGG SUPERCOATING

Planer

Scarptec Inc.

Subunternehmer

Apex Rockfall, LLC

Weitere verbaute Anwendungen

Steinschlagschutz, Minen und Bergbau

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail