USA
USA

myGeobrugg

Cacheuta Tunnel - Mendoza - Road N°82

Steinschlagschutz - Cacheuta Tunnel - Mendoza - Road N°82 2020

General view of the stabilized slope: TECCO® G65/3 system and the 4 meters high dynamic barrier RXE-500

Steinschlagschutz - Cacheuta Tunnel - Mendoza - Road N°82 2020

Drilling for the anchors (3.5 meters deep holes)

Steinschlagschutz - Cacheuta Tunnel - Mendoza - Road N°82 2020

Installing the mesh at the prepared slope

Steinschlagschutz - Cacheuta Tunnel - Mendoza - Road N°82 2020

In this section Rolled Cable Net QUAROX® and DELTAX® are installed

Steinschlagschutz - Cacheuta Tunnel - Mendoza - Road N°82 2020

TECCO® system stabilizing the rockface

Steinschlagschutz - Cacheuta Tunnel - Mendoza - Road N°82 2020

Assembly of the 4 meters high and 52 meters long rockfall barrier RXE-500

Steinschlagschutz - Cacheuta Tunnel - Mendoza - Road N°82 2020

Completed RXE-500 rockfall barrier

Steinschlagschutz - Cacheuta Tunnel - Mendoza - Road N°82 2020

View up the rockface - RXE-500 rockfall barrier

Steinschlagschutz - Cacheuta Tunnel - Mendoza - Road N°82 2020

Debris flow protection ring net VX060L, 4 meters high, 10 meters long

 

Systemlänge

10 m - 52 m

 

Installationsjahr

2020

Ausgangslage

In a section of Route 82, near the entrance of the Cacheuta tunnel N°1, rocks frequently fell on the road. These and landslides represented a danger for the traffic.

Massnahme

Several systems of protection against rockfall and debris flow, as well as slope stabilization, were implemented.

Installed systems per section:
1a)  RXE-500: 4 meters high and 31 meters long
1b)  VX-060L: 4 meters high and 10 meters long
2)  RXE-500: 4 meters high and 24 meters long
3)  RXE-500 :4 meters high and 42 meters long

4)  972 m² Rolled Cable Net QUAROX® Plus DELTAX®
     774 m² TECCO® G65/3 grid 2x2
     847 m² DELTAX® G80/2

Ausführende Firma

Geschützte Objekte

Strasse

Korrosionsschutz

GEOBRUGG SUPERCOATING

Weitere verbaute Anwendungen

Steinschlagschutz, Böschungsstabilisierung, Hangmuren- und Murgangschutz

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail